The McKevitt King Gazette

< Back to Blog

Projects Finishing up on Site

2020 has been a year to forget for most. Some building projects have endured two lockdowns over their programme. Thankfully construction has remained open second time around. So despite all the setbacks a number of projects are now reaching completion. A lot of clients will be delighted to be back in their homes in time for Christmas, with some happier than others to wave goodbye to their builders!

1

These projects include a number of houses and extensions. All boast quality design with varying form & expression. We look forward to photographing these projects in the new year when the grass grows, the leaves are on the trees, and there’s enough daylight.

5

by Richard Hatch

Projects Finishing up on Site

Read Older Blog Posts

O’Donnell & Byrne Ltd.

25 Feb 2020
O’Donnell & Byrne Ltd.
Read More

Do I need a Structural Engineer?

10 Dec 2019
Do I need a Structural Engineer?
Read More

Planning Permission: Suspension of statutory timeframes - UPDATE

21 Apr 2020
Planning Permission: Suspension of statutory timeframes - UPDATE
Read More